Your Community Newspaper - Larose, LA

Serving Raceland, Gheens, Lockport, Valentine, Larose, Cut Off, Galliano, Golden Meadow, Leeville, & Grand Isle

Sunday, April 22, 2018



Share This Article:

Repair Work on the Leeville Bridge Portion of LA1 Expressway

Repair Work on the Leeville Bridge Portion of LA1 Expressway

DOTD has announced that there will be repair work on the Leeville Bridge portion of the LA 1 Expressway that will result in a partial lane closure Thursday, February 6, 2014.

Beginning at 9:00 a.m. on February 6th, DOTD's contractor is scheduled to pour several sections of concrete barrier rail on the Leeville Bridge. Traffic will be routed through one lane during this road work, with the flow of traffic controlled by flaggers stationed at each end of the construction site. DOTD expects to have the bridge open to two way traffic by 3:00 p.m. Those who travel on the elevated portion of LA 1 should anticipate delays between 9:00 a.m. and 3:00 p.m.

Please use caution when traveling through the construction area and be on the lookout for work crews and their equipment.